11:23pm Wednesday 26 May 2010 Sydney (gmt+10)

Because things were going well with the way I set up the kitchen and the food operation at the "venue" where I was working at since NYE my employers decided to give me another project just down the road.

On the outside it seems like a nice place. But the kitchen was a different story. There was hardly anything, all the major equipments had to be installed, all the fridges has to be refitted with shelves and all the electrical setup had to be configured. We were basically starting from scratch.

And to add more inconvenience the installation of new equipment unexpectedly took a lot longer than scheduled. But it was too late. Truck-loads of produce and all the things needed in the kitchen (ie. pots, pans, utensils) arrived and we could not put them away. We could not do any cooking and preparation work for an entire day. We were left with only a few hours to sort everything out and make the kitchen operational in time for the Opening. Geez!

But instead of hanging around and waiting anxiously for things to get done I decided to meet up with Sheila. And we had yum-cha together. Just by being with her made me feel a lot better.

Finally we were able to get into the kitchen. It was a mad rush to get as much mise en place done as possible. And of course there were still a few little, frustrating issues than needed ironing out. But thankfully by Opening Day we were ok.